Making vases 8 and 9

The struggle it’s been real today is March 29th, My installation time is from the 7th to the 10th.

I will be in Georgia for a graphic design conference from the 9th to the 12th, I am very excited about it. It’s going to be a much-needed break, but all that means is that all of my pieces have to be finished and out of the kiln by too late, April 7th. :B

I can do it, though! I am low-key waiting for Brian to get back so we can fire the kilns together I am terrified of something happening this close to the end.

During spring break, I finished the boys of Vases 8 and 9.

Proof:

I look evil there. lol

but there is one of them.

And here is the other one!